|
Constructing Inside/Out
April 24, 2006
The laser-trip system has been tested and is working as a modular unit. The lighting units (20 of them, 2 per roof to create a 16ft long display) have been tested out and are ready for installation also.



TrackBack
TrackBack URL for this entry : http://www.jamesclar.com/mt/mt-tb.cgi/29

|